{"id":31715,"date":"2021-11-15T09:21:20","date_gmt":"2021-11-15T08:21:20","guid":{"rendered":"https:\/\/electriciens-sans-frontieres.org\/?p=31715"},"modified":"2021-12-08T15:59:38","modified_gmt":"2021-12-08T14:59:38","slug":"a-collective-of-players-in-the-electricity-industry-mobilized-in-the-event-of-a-humanitarian-crisis","status":"publish","type":"post","link":"https:\/\/www.electriciens-sans-frontieres.org\/en\/news\/a-collective-of-players-in-the-electricity-industry-mobilized-in-the-event-of-a-humanitarian-crisis\/","title":{"rendered":"A collective of players in the electricity industry mobilized in the event of a humanitarian crisis"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][easy-social-share buttons=&#8221;facebook,twitter,linkedin&#8221;][vc_column_text]<strong><em>Wednesday, November 3rd, 2021. St\u00e9phane Romatet, Director of the Crisis and Support Center of the French Ministry of Europe and Foreign Affairs, and Herv\u00e9 Gouyet, President of Electriciens sans fronti\u00e8res, renewed the partnership agreement involving many players in the French electricity industry.<\/em><\/strong><strong><em>\u00a0<\/em><\/strong>[\/vc_column_text][vc_column_text]A first agreement was signed in 2017. Since then, it has been activated several times to respond to crises in Indonesia, Mozambique, Lebanon and Armenia. Thus, thanks to this strategic renewal, our NGO can continue to call on the 13 foundations and companies associated within the agreement to mobilize material, financial, logistical and human resources in the event of any new humanitarian crisis.<\/p>\n<p><u>We thank our partners involved in this process for their trust:<\/u><\/p>\n<p>Enedis, RTE R\u00e9seau de Transport d&#8217;Electricit\u00e9, Legrand France, Schneider Electric fondation, Rexel foundation, Sonepar France, Prysmian Group, ECOSUN Innovations, LAGAZEL, NEXANS Foundation, Nov\u00e9a Energies, KOHLER-SDMO, EDF Group Foundation.[\/vc_column_text][vc_custom_heading text=&#8221;A strong commitment to optimize our emergency response &#8221; font_container=&#8221;tag:h3|text_align:left&#8221;][vc_row_inner css=&#8221;.vc_custom_1636536544458{background-color: #ffffff !important;}&#8221;][vc_column_inner width=&#8221;1\/2&#8243;]<div class=\"esf-quote\">\n\t<div class=\"esf-quote-content\">\n\t\t<p id=\"before-line\">\"<\/p>\n\t\t<span><em>This partnership agreement is an additional guarantee for our emergency interventions.<\/em><\/span><span id=\"after-line\">\"<\/span>\n\t<\/div>\n\t<div class=\"esf-quote-signature\">\n\t\t<span>Herv\u00e9 Gouyet<\/span>\n\t<\/div>\n<\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;31719&#8243;][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner][vc_column_text]In the event of a disaster linked to climate change, to a conflict or a crisis, the intervention of Electriciens sans fronti\u00e8res may be necessary and indispensable for the impacted populations. Our capacity to intervene depends on several parameters, including<\/p>\n<ul>\n<li>The availability of volunteers;<\/li>\n<li>The financial resources available;<\/li>\n<li>The need for materials;<\/li>\n<li>Logistics.<\/li>\n<\/ul>\n<p>The agreement established with the Crisis and Support Center of the French Ministry of Europe and Foreign Affairs since 2017 makes it possible to both cover a large part of the needs in case of an emergency and remove many constraints.<\/p>\n<p>The cooperation and responsiveness of the signatories are key in strengthening Electriciens sans fronti\u00e8res&#8217; ability to respond in emergency situations.[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The cooperation and responsiveness of the signatories are key in strengthening Electriciens sans fronti\u00e8res&#8217; ability to respond in emergency situations<\/p>\n","protected":false},"author":11,"featured_media":31721,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[490,687],"tags":[],"class_list":["post-31715","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-a-la-une-en"],"_links":{"self":[{"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/posts\/31715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/comments?post=31715"}],"version-history":[{"count":25,"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/posts\/31715\/revisions"}],"predecessor-version":[{"id":31752,"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/posts\/31715\/revisions\/31752"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/media\/31721"}],"wp:attachment":[{"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/media?parent=31715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/categories?post=31715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electriciens-sans-frontieres.org\/en\/wp-json\/wp\/v2\/tags?post=31715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}